FLYURA-TECH logo
FLYURA-TECH
Construction of the City Vaccine Warehouse (UNICEF)
International Organizations in DeliveryIN DELIVERY

Construction of the City Vaccine Warehouse (UNICEF)

About the project

The project is being implemented by order of the United Nations Children's Fund (UNICEF) and is aimed at constructing a modern city vaccine warehouse in Bishkek. The facility is designed for vaccine storage and distribution in full compliance with strict international standards for quality, safety, and temperature control. Project implementation supports the development of the healthcare system of the Kyrgyz Republic and improves the efficiency of the national immunization program.

Scope of works

  • Preparatory and earthworks
  • Foundation and load-bearing structure works
  • Construction of the warehouse building
  • Installation of refrigeration and engineering systems for vaccine storage
  • Installation of power supply and backup power systems
  • Installation of ventilation and climate control equipment
  • Interior finishing works
  • Site improvement works

Key features

  • The project is being implemented in partnership with the international organization UNICEF
  • Compliance with international vaccine storage standards (cold chain)
  • High requirements for engineering systems reliability
  • Use of specialized equipment for medical logistics
  • Enhanced requirements for construction quality, safety, and control
  • Contribution to the national healthcare system

Result

  • Creation of a modern vaccine storage center
  • Improved efficiency of medical product logistics
  • Ensured stable temperature-controlled storage conditions
  • Strengthening of the country's healthcare infrastructure
Construction of the City Vaccine Warehouse (UNICEF) — фото 2

Key details

  • Client

    United Nations Children's Fund (UNICEF)

  • Location

    Bishkek

  • Period

    2026 – present

  • Work type

    New construction

  • Company role

    Project Executor